Chief engineers and engineers

Know which repair comes first and what happened last time

One ranked queue shows which rooms are off sale, which maintenance is due and each machine’s history, from the first report to the checked fix.

Work from one ranked queue with the history of every machine beside it.

A hotel maintenance engineer with a tablet at a guest bathroom door
Fix this firstRanked for you
Repeat faultFlagged, not hidden
ScheduledRoutine checks with steps
The work list ranked by priority

What you see on your open jobs

What to fix next

Work orders ranked by priority and due time, with the room each one keeps off sale.

Maintenance coming due

Planned maintenance that is late or due soon, with the checklist steps already done.

The history of every machine

Each repair stays with the equipment, so the next job starts from what happened last time.

What you see first

Roomline opens on your open work orders, ranked, with the rooms they hold.

  • Ranked work orders
  • Rooms held by repairs
  • Planned maintenance
  • Equipment history
  • Automatic rules you switch on
Work orders in Roomline with counts for open, overdue, holding a room and unassigned, a list of work orders each with priority, owner and due time and whether it holds a room, and the selected work order opened beside it.

What changes for engineering

Preventive maintenance
  • Held rooms come first

    Jobs that keep a room off sale rise to the top of the queue.

  • Fix the cause, not the symptom

    Repeat faults are flagged on the machine, with every earlier repair beside them.

  • Planned maintenance that gets done

    Recurring checks come with step checklists; a failed step opens the fix.

  • A closed job tells the whole story

    Every job ends with a written fix that the next engineer can read.

Work a shift from the engineering office

The demo follows a fault from the floor to a confirmed work order and the machine’s history.

HTMS™ for Engineering and maintenance | Techorph